• info@adayc.com
Adayc
  • Home
  • About Us
  • Services and Products
  • Projects
  • Contact
  • English
  • Español
Select Page
January 2018 – March 2019, BOLIVIA

January 2018 – March 2019, BOLIVIA

Development of a high voltage transmission line, 570km length. Associated to this line, the development of a natural gas-fired power plant. Detailed engineering

The project aims to develop the detailed engineering of a high voltage transmission line between Los Troncos and San Matias (Brazilian border). Estimated length of this transmission line will be 570km. Associated to this transmission line, a new natural gas-fired...

Proyectos

  • Ongoing, UZBEKISTAN
  • June 2019 – June 2021, BOLIVIA
  • February 2019 – December 2019, GAMBIA
  • October 2018 – February 2019, COLOMBIA
  • September 2018 – March 2019, NIGERIA
  • January 2018 – June 2018, COLOMBIA
  • January 2018 – July 2018, SPAIN
  • January 2018 – March 2019, BOLIVIA
  • June 2017 – January 2018, ETHIOPIA
  • October 2016 – January 2017, CUBA
  • Legal Notice & Privacy Policy
  • | © 2022 ADAYC – All Rights Reserved.
  • English
  • Español