The project aims to develop the detailed engineering of a high voltage transmission line between Los Troncos and San Matias (Brazilian border). Estimated length of this transmission line will be 570km.

Associated to this transmission line, a new natural gas-fired power plant shall be developed. Also, a new renewable power plant will be analyzed as upgrading.

The project consists on preparing all documentation, specifications and other documents related to the detailed engineering. The project also includes the technical and financial feasibility studies in both power plants according to IADB rules

Preparation of basic design and detailed engineering of a natural gas-fired power plant of 30MW nominal capacity

Analysis of a renewable power plant located in another town as part of the project. Source not yet defined but, probably, solar or biomass. Estimated capacity 2MW.